Positive Material Identification (PMI)

What Is It

Confirm the Exact Alloy Grade

IRC Engineering’s Positive Material Identification service confirms the alloy grade of critical components on-site, in seconds.

Material mix-ups - such as an incorrect fitting, valve, or component - can lead to leaks, ruptures, or failure under corrosion, temperature, or pressure.

PMI verifies that the material in front of you matches your specification.

Suitable for:

  • New construction and fabrication
  • In-service piping and valves
  • Weld and filler materials
  • Receiving inspection
  • Turnaround and shutdown work

Why PMI

Why It’s Worth Doing Every Time

PMI is a fast, decisive check for preventing avoidable material-related failures.

Fast

Results in seconds, on the shop floor or in the field.

Non-Destructive

No sampling, component damage, or downtime.

Portable

Suitable for components of any size, including those too large to move.

Traceable

Every scan is logged for compliance and traceability records.

How It Works

Our PMI Testing Method

Our technicians use handheld X-ray Fluorescence (XRF) analysers to identify alloy grades without damaging the component.

01

Surface Scan

The XRF analyser scans the component surface.

02

X-Ray Response

A low level of radiation causes the material’s atoms to emit characteristic X-rays.

03

Element Analysis

The analyser measures the energy and intensity of this response.

04

Alloy Identification

The elements present are identified.

05

Grade Verification

The alloy grade is confirmed against the required material specification.

Results are available within seconds, without damaging the component.

 

Our Toolkit

Our PMI Testing System

Handheld XRF Analysers

Identify the elements present in a component on-site.

On-Site Verification

Confirm alloy grades before installation or during inspection.

Non-Destructive Testing

No sample cutting or component damage.

Logged Scan Records

Scan results can be included in compliance and traceability records.

Fast, portable PMI verification for critical components.

Where We Apply It

Where PMI Makes the Difference

01

New Construction & Fabrication

Verify materials before they enter service.

02

Retroactive Verification

Check in-service piping, valves, and pressure equipment.

03

Weld & Filler Material Checks

Confirm that filler metal matches the base-material specification.

04

Receiving Inspection

Catch supplier material errors before installation.

05

Turnaround & Shutdown Inspections

Verify critical components during maintenance windows.

PMI helps identify material mix-ups before they become mechanical-integrity failures.

Why IRC

Why IRC Engineering Services?

Delivering PMI Since 1995

Precision material verification for critical components.

On-Site Confirmation

Exact alloy-grade identification where the component is located.

Fast Results

Material verification within seconds.

Non-Destructive Testing

No sampling, no damage, and no downtime.

Traceable Documentation

Logged scan results for compliance and traceability records.

One material check can prevent a costly failure.

Quick Enquiry

We’d love to hear from you

Call Us

We would love to connect with you, please fill out this form and our dedicated team will respond to you shortly.

    Scroll to Top